FPA provided final design services for the rehabilitation of approximately 1.6 miles of County Route 619 (Commonwealth Avenue) in the Strathmere section of Upper Township through resurfacing and minimal full depth pavement reconstruction.  The design was Federally funded through the SJTPO.

The project included the modification of the existing roadway profile to increase elevation to improve roadway passage during storm events while adjusting the cross slopes to minimize right of way and environmental impacts. Scope of work also included drainage analysis resulting in the replacement of existing drainage structures and the installation of new drainage structures. Sidewalks at the intersections within the project limits were replaced to conform with current ADA and PROWAG Standards. As part of this project FPA developed exhibits and handouts for Public Information meetings to assist Cape May County in securing public support.

FPA also provided construction support services during the construction of the improvements.