skip to Main Content

FPA provided preliminary and final design of intersection improvements which included the complete replacement of an existing substandard traffic signal, including installation of pedestrian facilities, as well as widening of all approaches to accommodate large truck traffic which regularly utilizes the intersection.  FPA prepared LTS and Electrical Plans, and traffic analysis for development of traffic signal timing directives.

The project also included the installation of new curb and sidewalk, ADA compliant curb ramps, and roadway drainage systems.

FPA also provided construction administration, full time construction inspection, and materials testing services during construction.

Back To Top