FPA provided preliminary and final design of intersection improvements which included the complete replacement of an existing substandard traffic signal, including installation of pedestrian facilities.  Prepared LTS and Electrical Plans, and traffic analysis for development of traffic signal timing directives.

The project also included upgrades to the existing drainage system and the replacement of a structurally deficient concrete box culvert with a twin pipe culvert along with securing associated NJDEP freshwater wetland and flood hazard area permitting.

FPA also provided construction administration, full time construction inspection, and materials testing services during construction.