FPA was retained by Dakota Excavating Contractors to prepare construction documents and obtain necessary permits to replace synthetic turf at the Rutgers NCAA Football Field.

The NCAA Football Field had to be regraded to reduce the crown in the field to .75 percent. State of the art turf was installed to provide a playing surface. This project was completed within a one month period.

FPA provided project management, landscape architecture, land development, and construction administration services to complete this project.