Our Services

Telecommunications Engineering and Design

French & Parrello Associates (FPA) is a recognized leader in providing engineering services to the wireless communications industry. The diversity and experience of our staff allows projects to be designed and coordinated internally, providing our clients the convenience of “one-stop shopping”. We have successfully completed tens of thousands of wireless facilities in the United States and Caribbean. Our timely response, quality designs, and commitment to client satisfaction have become our trademark in the industry.

  • Site Acquisition Services
  • Site Assessments and Site Audits
  • FAA Surveys
  • Pre-Lease and Lease Exhibit Preparation
  • Site Layout and Design
  • Site Plan Preparation for
  • Municipal Review
  • Expert Testimony
  • Construction Drawing Preparation
  • Construction Permitting Services
  • Geotechnical Assessments
  • Mount Analyses
  • Structural Analyses: Towers, Rooftops, Water Tanks, Stealth Support Structures
  • All Phases of Small Cell Node Evaluation, Analysis, Design and Permitting
    Foundation Design for Towers and Shelters
  • Structural Design of Antenna Mounts
  • Mechanical and Electrical Design
  • Utility Engineering
  • Traffic Engineering
  • OSP Construction QC
  • Data Collection Tools and App Development

Services for Managed Rooftops

  • Initial Survey and Risk Assessment

    Initial field visit to verify existing field conditions. Evaluate building from a structural, utilities and environmental perspective. Develop risk assessment reports

  • Design Phase

    Provide safe and effective design which limits risk and maintenance. Maximize available real estate. Minimize impact to building owner. Provide stealth screening design when requested.

  • Construction Phase

    Confirm installation is in accordance with plans. Modify design when conditions dictate. Sign off on installation.

  • Maintenance and Loss Prevention

    Annual surveys. Post-wind even surveys (greater than 75mph)

  • Site Decommissioning

    Provide decommissioning design drawings. Provide post-construction sign off.

  • Dispute Resolution

    Evaluate roof leaks to determine contributing factors. Evaluate building cracking and out of plumb walls/parapets to determine factors.

Related Projects